Title 35 · WY
35-11-425, the operator making the permit application
Citation: Wyo. Stat. § 35-11-425
Section: 35-11-425
35-11-425, the operator making the permit application demonstrates that, prior to January 1, 1977, he has made substantial legal and financial commitments in relation to the operation for which he is applying for a permit;
(v) The proposed operation would:
(A) Not interrupt, discontinue, or preclude farming on alluvial valley floors that are irrigated or naturally subirrigated, but, excluding undeveloped range lands which are not significant to farming on said alluvial valley floors and those lands as to which the administrator finds that if the farming that will be interrupted, discontinued or precluded is of such small acreage as to be of negligible impact on the farm's agricultural production; or
(B) Not materially damage the quantity or quality of water in surface or underground water systems that supply these alluvial valley floors. Paragraph (n)(v) of this section shall not affect those surface coal mining operations which in the year preceding August 3, 1977, produced coal in commercial quantities, and were located within or adjacent to alluvial valley floors or had obtained specific permit approval by the administrator to conduct surface coal mining operations within said alluvial valley floors. If coal deposits are precluded from being mined by this paragraph, the administrator shall certify to the secretary of the interior that the coal owner or lessee may be eligible for participation in a coal exchange program pursuant to section 510(b)(5) of P.L. 95-87.
(vi) If the area proposed to be surface coal mined contains prime farmland, the operator has the technological capability to restore such mined area, within a reasonable time, to equivalent or higher levels of yield as nonmined prime farmland in the surrounding area under equivalent levels of management and can meet the soil reconstruction standards of this act and the regulations promulgated pursuant thereto;
(vii) The schedule provided in paragraph (a)(xiv) of this section indicates that all surface coal mining operations owned or controlled by the applicant are currently in compliance with this act and all laws referred to in paragraph (a)(xiv) of this section or that any violation has been or is in the process of being corrected to the satisfaction of the authority, department or agency which has jurisdiction over the violation.
(o) No permit shall be issued to an applicant after a finding by the director or council, after opportunity for hearing, that the applicant or operator specified in the application controls or has controlled mining operations with a demonstrated pattern of willful violations of such nature and duration with such resulting irreparable harm to the environment as to indicate reckless, knowing or intentional conduct.
(p) The following objection procedure shall apply to applications for mining permits for coal:
(i) Any interested person has the right to file written objections to the application with the director within thirty (30) days after the last publication of the notice required in subsection (j) of this section. The director shall within five (5) business days forward any objection to the applicant and shall make objections available to the public;
(ii) If an informal conference is requested by the applicant or objector, the director shall hold the informal conference in the locality of the proposed operation within thirty (30) days after the final date for filing objections under paragraph (i) of this subsection unless a different period is stipulated to by the parties. The director shall publish notice of the time, date and location of the informal conference in a newspaper of general circulation in the locality of the proposed operation at least two (2) weeks before the date of the informal conference;
(iii) The director shall render a decision on the application within thirty (30) days after the deadline to file objections provided in paragraph (i) of this subsection if no informal conference is requested. If the director holds an informal conference, all parties to the conference shall be furnished with a copy of the final written decision of the director issuing or denying the permit within sixty (60) days of the conference. The applicant or objector may appeal the director's written decision after an informal conference to the council. If a hearing is held, the hearing shall be conducted as a contested case in accordance with the Wyoming Administrative Procedure Act and the council shall issue findings of fact and a decision on the application within sixty (60) days after the final hearing;
(iv) Notwithstanding W.S. 35-11-1001, only the applicant or an objector who participated in a hearing before the council may obtain judicial review of the council's decision.
(q) The following objection procedure shall apply for any other mining permit application:
(i) Any interested person has the right to file written objections to the administrator within thirty (30) days after the last publication of the notice required in subsection (j) of this section. The administrator shall within five (5) business days forward any objection to the applicant and shall make objections available to the public;
(ii) The administrator shall review all objections and shall forward a report and recommendations on the objections to the director. The director shall issue to the applicant and to any objector a final written decision issuing or denying the permit within thirty (30) days after the deadline to file objections provided in paragraph (i) of this subsection;
(iii) The applicant or objector may appeal the director's written decision to the council. If a hearing is held, the council shall issue findings of fact and a decision within sixty (60) days after the final hearing;
(iv) A person who does not object as provided under this subsection has no right of appeal.
35-11-407. Water impoundments.
(a) In any plan for the creation of a permanent water impoundment the applicant must adequately demonstrate that: (i) The size of the impoundment, contouring and revegetation, if any, are suitable for its intended purpose and use;
(ii) Final grading will provide adequate safety and access for proposed water users;
(iii) The impoundment dam construction will be so designed to insure permanent stability and to prevent safety hazards.
35-11-408. Permit transfer.
A permit holder desiring to transfer his permit shall apply to the administrator. The potential transferee shall file with the administrator a statement of qualifications to hold a permit as though he were the original applicant for the permit and shall further agree to be bound by all of the terms and conditions of the original permit. The administrator shall recommend approval or denial of the transfer to the director. No transfer of a permit will be allowed if the current permit holder is in violation of this act, unless the transferee agrees to bring the permit into compliance with the provisions of this act.
35-11-409. Permit revocation.
(a) The director shall revoke a mining permit if at any time he determines that the permit holder intentionally misstated or failed to provide any fact that would have resulted in the denial of a mining permit and which good faith compliance with the policies, purposes, and provisions of this act would have required him to provide.
(b) Unless an emergency exists, and except as otherwise provided in this act, the revocation of a permit shall become effective upon thirty (30) days' notice to the operator. In an emergency, a special meeting of the council may cause a revocation to become effective upon receipt of notice by the permit holder.
(c) When an inspection carried out pursuant to the enforcement of this act reveals that a pattern of violations by any surface coal mine operator of any requirements of this act or any permit conditions required by this act has existed, and that these violations were caused by the unwarranted failure of the operator to comply with these requirements or permit conditions, or that these violations are willfully caused by the operator, the director shall issue an order to the operator to show cause why the permit should not be suspended or revoked. Opportunity for a public hearing before the council shall be provided. If a hearing is requested the director shall inform all interested parties of the time and place of the hearing. Upon failure of the operator to show cause why the permit should not be suspended or revoked, the council shall suspend or revoke the permit.
35-11-410. License to mine for minerals; application.
(a) A license to mine is issued for the duration of the mining operation on the permit area unless sooner revoked or suspended as provided herein. No mining operation of any kind may be commenced or conducted without a license to mine.
(b) Any operator desiring to engage in a mining operation shall make a written application to the administrator on forms furnished by the administrator for a license to mine. A license is required for each mining operation for which a separate mining permit is issued. The application shall contain or be accompanied by:
(i) The name and address of the applicant;
(ii) A copy of the mining permit for the lands which are to be affected by the proposed mining operation, and if the applicant is other than the permit holder, a copy of the instrument of permission from the permit holder granting to the applicant the rights thereto;
(iii) If the applicant for the license is other than the permit holder, a statement that the applicant has never had any permit issued by the administrator revoked, or license issued by the board revoked, or bond posted to comply with the act forfeited for intentional and substantial violation of the provisions of this act;
(iv) The location and number of acres of the area to be affected by the proposed mining operation for the first year of operation if less than the full extent of the permit area;
(v) The estimated dates of commencement and termination of the proposed mining operation;
(vi) A fee of one hundred fifty dollars ($150.00). (c) The administrator shall promptly review the license application and if he finds the application in order and consistent with the terms of the permit and any other provisions of this act, the administrator will determine the size of the bond to be posted for the purpose of insuring reclamation of the lands affected during the first year of operation and upon receipt of said bond will promptly issue the license.
35-11-411. Annual report.
(a) An operator shall file an annual report with the administrator on or within thirty (30) days prior to the anniversary date of each permit. The report shall include:
(i) The name and address of the operator and the permit number;
(ii) A report in such detail as the administrator shall require supplemented with maps, cross sections, aerial photographs, photographs, or other material indicating:
(A) The extent to which the mining operations have been carried out;
(B) The progress of all reclamation work;
(C) The extent to which expectations and predictions made in the original or any previous reports have been fulfilled, and any deviation therefrom, including but not limited to the quantity of overburden removed, the quantity of minerals removed, and the number of acres affected.
(iii) A revised schedule or timetable of operations and reclamation and an estimate of the number of acres to be affected during the next one (1) year period.
(b) Upon receipt of the annual report the administrator shall make such further inquiry as shall be deemed necessary. If the administrator objects to any part of the report or requires further information he shall notify the permittee as soon as possible and shall allow a reasonable opportunity to provide the required information, or take such action as shall be necessary to remove the objection.
(c) As soon as possible after the receipt of the annual report the administrator shall conduct an inspection of the site of the operation. A report of this inspection shall be made a part of the permittee's annual report and a copy shall be delivered to the operator.
(d) Within sixty (60) days after receipt of the annual report, inspection report and other required materials, if the administrator finds the annual report in order and consistent with the reclamation plan as set forth in the permit, or as amended to adjust to conditions encountered during mining and reclamation operations as provided by law, the director shall determine the size of the bond to be posted for the purpose of insuring reclamation of the lands affected during the ensuing year.
35-11-412. License revocation or suspension.
(a) The director shall revoke an operator's license:
(i) If at any time he becomes aware of the existence of any fact, reason, or condition that would have caused him to deny an application for a mining permit whether or not such condition existed at the time of the application;
(ii) If he determines that the operator intentionally misstated or failed to provide any fact that would have resulted in the denial of a license and which good faith compliance with the policies, purposes and provisions of this act would have required him to provide.
(b) The director may suspend the license if he determines the operator is in substantial violation of the terms of the license or of the provisions of this act. The suspension shall be lifted when the violations have been corrected to the director's satisfaction. No suspension shall be unreasonably prolonged.
(c) Unless an emergency exists, the revocation or suspension of a license shall become effective upon thirty (30) days notice to the applicant. In the case of an emergency, the director may cause such revocation or suspension to become effective immediately upon receipt of notice.
35-11-413. Special license to explore for minerals by dozing.
A special license to explore for minerals by dozing may be issued by the administrator for a one (1) year period without a permit. 35-11-414. Special license to explore for minerals by dozing; application; standards; fee; bond; denial; appeal.
(a) Any person desiring to engage in mineral exploration by dozing shall apply to the administrator for a special license. The application shall be in accordance with rules and regulations adopted pursuant to the standards set forth in subsection (b) of this section, by the council upon recommendation by the director after consultation with the administrator and advisory board, and shall be accompanied by a fee of two hundred fifty dollars ($250.00).
(b) The council shall establish rules and regulations pursuant to the following reclamation standards for exploration by dozing:
(i) Backfilling the topsoil disturbed by dozing to its approximate original contour;
(ii) Revegetation of the land affected by dozing, including species to be used;
(iii) Timetables for the accomplishment of the above reclamation program.
(c) After reviewing the application for special license to explore by dozing the administrator shall set the amount of the bond necessary to insure complete reclamation and issue the special license to explore.
(d) The administrator may deny the special license to explore if he believes the application is in violation of the purpose of this act.
(e) The decision of the administrator may be appealed through the director to the council.
(f) All special licenses to explore issued by the administrator shall be reviewed by the council at their next regularly scheduled meeting.
(g) A bond posted under the terms of this section shall be released upon completion of the exploration, by dozing, the reclamation program, and an inspection by the administrator. Failure to comply with the provisions of this section will result in forfeiture of the bond. (h) If the proposed exploration by dozing will substantially affect forty (40) or more acres in any four (4) contiguous sixteenth sections, the application shall conform to the reclamation standards and requirements governing surface mining, and the provisions of this section shall not apply.
(j) Any abandoned drill hole shall be subject to the reclamation provisions of subsection 30-96.16(e) of the statutes.
35-11-415. Duties of operator.
(a) Every operator to whom any permit or license is issued shall comply with all requirements of this act, the rules and regulations promulgated hereunder, and reclamation plans and other terms and conditions of any permit or license.
(b) The operator, pursuant to an approved surface mining permit and mining plan and reclamation plan, or any approved revisions thereto, shall:
(i) Conspicuously post and maintain at each entrance to the operation, a sign which clearly shows the name, address and telephone number of the operator, the name of his local authorized agent, and the permit number of his operation;
(ii) Conduct all surface mining and reclamation activities within the permit area in conformity with his approved plan;
(iii) Protect the removed and segregated topsoil from wind and water erosion, and from acid or toxic materials, and preserve such in a usable condition for sustaining vegetation when restored in reclamation, or if topsoil is virtually nonexistent or is not capable of sustaining vegetation, then subsoil, which is available and suitable, shall be removed, segregated, and preserved in a like manner as may be required in the approved reclamation plan;
(iv) Cover, bury, impound, contain or otherwise dispose of toxic acid forming, or radioactive material or any material determined by the administrator to be hazardous to health and safety, or which constitutes a threat of pollution to surface or subsurface water as may be required in the approved reclamation plan; (v) Conduct contouring operations to return the land to the use set out in the reclamation plan;
(vi) Backfill or grade, and replace topsoil, or approved subsoil, which has been segregated and preserved as may be required in the approved reclamation plan;
(vii) Replace, as nearly as possible, native or superior self regenerating vegetation on land affected, as may be required in the approved reclamation plan;
(viii) Prevent, throughout the mining and reclamation operation, and for a period of five (5) years after the operation has been terminated, pollution of surface and subsurface waters on the land affected by the institution of plantings and revegetation, the construction of drainage systems and treatment facilities including settling ponds and the casing, sealing of boreholes, shafts, and wells so that no pollution is allowed to drain untreated into surface or subsurface water in accordance with state or federal water quality standards, whichever are higher, as may be required in the approved reclamation plan;
(ix) Reclaim the affected land as mining progresses in conformity with the approved reclamation plan;
(x) For surface coal mining operations, preserve throughout the mining and reclamation process the essential hydrologic functions of alluvial valley floors if these areas are classified within a permit. This paragraph does not alter the authority granted under any other section of this act with respect to requirements for preserving throughout the mining and reclamation process the essential hydrologic functions of the minesite, or associated offsite areas, of other mining operations;
(xi) For surface coal mining operations, insure that explosives are used only in accordance with existing state and federal law and the rules and regulations promulgated by the council, which shall include but are not limited to provisions to:
(A) Provide adequate advance written notice to local governments and residents who might be affected by the use of these explosives by publication of the planned blasting schedule in a newspaper of general circulation in the locality and by mailing a copy of the proposed blasting schedule to every resident within one-half (1/2) mile of the proposed blasting site and by providing daily notice to the resident or occupiers in these areas prior to any blasting;
(B) Maintain for a period of at least three (3) years and make available for public inspection upon request a log detailing the location of the blasts, the pattern and depth of the drill holes, the amount of explosives used per hole, and the order and length of delay in the blast;
(C) Limit the types of explosives and detonating equipment, the size, timing and frequency of blasts based upon the physical conditions of the site so as to prevent:
(I) Injury to persons;
(II) Damage to public and private property outside the permit area;
(III) Adverse impacts on any underground mine;
(IV) A change in the course, channel or availability of ground or surface water outside the permit area.
(D) Require that all blasting operations be conducted by trained and competent persons as certified by the administrator;
(E) Provide that upon the request of a resident or owner of a man-made dwelling or structure within one-half (1/2) mile of any portion of the permitted area the applicant or permittee shall conduct a preblasting survey of these structures and submit the survey to the administrator and a copy to the resident or owner making the request. The area of the survey shall be decided by the administrator and shall include provisions as the United States secretary of the interior shall promulgate.
(xii) For surface coal mining operations, replace in accordance with state law the water supply of an owner of interest in real property who obtains all or part of his supply of water for domestic, agricultural, industrial or other legitimate use from an underground or surface source where the supply has been affected by contamination, diminution or interruption proximately resulting from the surface coal mine operation; (xiii) Comply with the blasting plan required and submitted under W.S. 35-11-406(b)(xxi) for the use of explosives at noncoal surface mining operations.
35-11-416. Protection of the surface owner.
(a) In those instances in which the surface owner is not the owner of the mineral estate proposed to be mined by mining operations a permit shall not be issued without the execution of a bond or undertaking to the state, whichever is applicable, for the use and benefit of the surface owner or owners of the land, in an amount sufficient to secure the payment for any damages to the surface estate, to the crops and forage, or to the tangible improvements of the surface owner. This amount shall be determined by the administrator and shall be commensurate with the reasonable value of the surrounding land, and the effect of the overall operation of the landowner. This bond is in addition to the performance bond required for reclamation by this act. As damage is determined it shall be paid. Financial loss resulting from disruption of the surface owner's operation shall be considered as part of the damage. A bond for surface damage shall not be required when the agreement negotiated between the surface owner and the mineral owner or developer waives any requirement therefor. Payment of damages shall be paid annually unless otherwise agreed to by the surface owner and the operator.
(b) An owner of real property and who holds a valid adjudicated water right and who obtains all or part of his supply of water for domestic, agricultural, industrial, recreational, or other legitimate use from a surface or an underground source other than a subterranean stream having a permanent distinct known channel may maintain an action against an operator to recover damages for pollution, diminution, or interruption of such water supply resulting from surface, in situ mining or underground mining.
35-11-417. Bonding provisions.
(a) The purpose of any bond required to be filed with the administrator by the operator shall be to assure that the operator shall faithfully perform all requirements of this act and comply with all rules and regulations of the board made in accordance with the provisions of this act. (b) All bonds shall be signed by the operator as principal, by a good and sufficient corporate surety licensed to do business in the state, and be made payable to the state of Wyoming. At the discretion of the director, the record mineral owner of the land to be mined may also be required to join as principal. This subsection shall not apply to collateral bonds issued pursuant to subsection (g) of this section.
(c) The amount of any bond to be filed with the administrator prior to commencing any mining shall be:
(i) For an initial bond the amount equal to the estimated cost of reclaiming the affected land disturbed and restoring, as defined in W.S. 35-11-103(f)(iii), any groundwater disturbed by in situ mining during the first year of operation under each permit. The estimated cost shall be based on the operator's cost estimate submitted with the permit plus the administrator's estimate of the additional cost to the state of bringing in personnel and equipment should the operator fail or the site be abandoned. In no event shall the bond be less than ten thousand dollars ($10,000.00), except for limited mining operations authorized and bonded under W.S. 35-11-401(e) or any noncoal mine the affected land of which, excluding roads, is ten (10) acres or less, in which case the bond amount shall be set by the administrator with approval of the director to cover the cost of reclamation, and in no event less than two hundred dollars ($200.00) per acre, for affected land;
(ii) For renewal bonds the amount equal to the estimated cost of reclaiming the land to be disturbed during that renewal period, and the estimated cost of completing reclamation of unreleased lands and groundwater disturbed during prior periods of time. The estimated cost shall be based on the operator's cost estimate, which shall include any changes in the actual or estimated cost of reclamation of unreleased affected lands, plus the administrator's estimate of the additional cost to the state of bringing in personnel and equipment should the operator fail or the site be abandoned. In no event shall the bond be less than ten thousand dollars ($10,000.00), except for limited mining operations authorized and bonded under W.S.